News
3783
- 05 Jan 2016 TCL ENDS THE YEAR ON THE WATERLINE After months of successive losses, driven mainly by the slowing down of exports to Angola, the Leixões Container Terminal closed the month of December in line with the achieved in the same month in 2014.In the last month of 2015, TCL handled 49,019 TEU, representing a decre ...
- 04 Jan 2016 TCL OVERCAME AGAIN THE 600,000 TEU HANDLED For the third consecutive year, in 2015, the Leixões Container Terminal has exceeded the barrier of 600,000 TEU handled.Compared to 2014, a record year, in the year now ended, the result of TCL means a decline of 6.6%. Should be emphasized, however, that this drop is much s ...
- 31 Dec 2015 FCT GETS THE STEVEDORING LICENCE The company Ferrol Container Terminal SA (FCT), concessionaire of the container terminal in the outer harbour of Ferrol, owned 100% by TCL, just received from Port Authority the licence to render stevedoring services.The licence is the first step required to FCT start ope ...
- 30 Dec 2015 7.800 TEU HANDLED IN CHRISTMAS' WEEK Just 20 vessels called Leixões Container Terminal during week 52, the Christmas' week.Those vessels handled 7,826 TEU, corresponding to 4,702 containers.The most intense working day was precisely the day after Christmas, the 26th December, when 26 vessels were operated and ...
- 30 Dec 2015 "IRENES REMEDY" DEBUTS AS SHIP OF THE WEEK In her third call at Leixões Container Terminal in the current year the "Irenes Remedy" was the Ship of the Week.It happened in the week 52, between 21st and 27th December, being "Irenes Remedy" at TCL on the 21st to 22nd.Maersk Line vessel arrived on ...
- 23 Dec 2015 33 SHIPS OPERATED IN A WEEK It was of intense work the week no. 51 at the Leixões Container Terminal.Between 14 and 20 December, TCL received and operated no less than 33 ships. Which resulted in the movement of 8,088 containers, or 13,205 TEU.The most intense day, measured by the number of containers ...





